How long does it take to fit a wet room?

Fitting a wet room usually takes 5–7 days. Our team manages everything from removal to finishing touches, with minimal disruption.

The installation of a wet room is a detailed process that ensures your new space is both safe and built to last. Typically, fitting a wet room takes between 5 and 7 days from start to finish, depending on the size of your bathroom and the complexity of the work required.

Here’s what’s involved:

  • Day 1: Our team carefully prepares your home by protecting floors and entryways, then removes your old bath, shower, or fittings. Any plumbing or electrical adjustments are started.

  • Days 2–5: We install the wet room system, including tanking (waterproofing), flooring, wall finishes, and drainage. Safety features such as anti-slip flooring and grab rails are added during this stage.

  • Final days: All finishing touches are completed, such as tiling, fitting screens, and installing fixtures. The room is thoroughly cleaned, and we carry out final safety checks to ensure everything is perfect.

Our experienced in-house team works efficiently and tidily, keeping disruption to your home to a minimum and ensuring your new wet room is ready for use as quickly as possible. If your project involves special adaptations or custom features, we’ll keep you updated on the timeline throughout.